CABLE ID AND SPIKING TRAINING - 1 DAY COURSE

 

 

 

DAY 1 - CABLE IDENTIFICATION, SPIKING THEORY & METHODS

 

    1. Introduction
        1. 1.1 Transmitter
          1.2 Reciever

       

    2. Safety
    3. Guidelines
    4. Connections
        1. 4.1 Connection with Earth as Return Line
          4.2 Multicore Cable Sheath Insulated
          4.3 Connection Samples for PILC Cable and other ground sensing cable

         

            4.3.1 Single core cable
            4.3.2 Multi core cable, (eg PILC)

         

          4.4 Connecting with second line as return line
          4.5 Inductive Coupler (Optional)
          4.6 Phase Selection

       

    5. Operational Sequence
        1. 5.1 Calibration
          5.2 Measuring Sequence
          5.3 Measurement Results
          5.4 Current Measurement

       

    6. Schermer Spiking Gun
        1. 6.1 Basic Description
          6.2 Schermer Spiking Gun Tools and Accessories
          6.3 Safety Precaution before Spiking
          6.4 Preparation of the Schermer Cable Spiking Gun before the Spiking Takes place
          6.5 Fitting the Spiking Gun to the Cable and Preparing to Load the Spike after firing the Spiking Gun
          6.6 Maintenance of the Firing Pin
          6.6 Practical Demonstration of the Spiking Gun

       

REQUEST A QUOTE

 

© 2019 HV Academy Subsidary of H.V. TEST (PTY) LTD.